INDUSTRIAL COMPLEXES – Part 2 Planning and Design
نویسندگان
چکیده
منابع مشابه
Planning and Meta-Planning (MOLGEN: Part 2)
The selection of what to do next is often the hardest part of resource-limited problem solving. In planning problems, there are typically many goals to be achieved in some order. The goals interact with each other in ways which depend both on the order in which they are achieved and on the particular operators which are used to achieve them. A planning program needs to keep its options open bec...
متن کاملInvestigation of forward directivity effects on design spectra of industrial complexes near Assaluyeh fault
Recorded ground motions in near fault region have completely distinct nature from others that recorded in far field of the fault. Near source outcomes cause much of the seismic energy to appear in a single large and long period pulse at the beginning of the velocity record. Assaluyeh complex is located near the reverse Assaluyeh fault that is a segment of Mountain Front Fault. This complex cont...
متن کاملDesign 18 : 2 Methodological Naturalism ? Part 2
[This is the second part of a two-part article.] The philosophical doctrine of methodological naturalism is flawed. In many areas, science is not religiously neutral. Furthermore, neither claims about the definition or essential nature of science, nor theological presuppositions (e.g., "functional integrity"), can properly support methodological naturalism. However, one may find stronger suppor...
متن کاملAsynchronous Design - Part 2: Systems and Methodologies
h THIS TWO-PART article aims to provide both a short historical and technical overview of asynchronous design, as well as a snapshot of the state of the art. Part 1 covered foundations of asynchronous design, and highlighted recent applications, including commercial advances and use in emerging application areas. Part 2 focuses on methodologies for designing asynchronous systems, including basi...
متن کاملProof Planning and Industrial Configuration
The problem of configuration is a complex industrial issue. It has been shown in the past that considerable amounts of labour were spent on problems connected with manufacturing based decisions. Planning and scheduling, design and configuration, logistics and resource management are representative examples. In the case where the complexity of products to be manufactured is getting more flexible...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Science, Humanities and Arts - JOSHA
سال: 2017
ISSN: 2364-0626
DOI: 10.17160/josha.4.5.350