IMPROVING PERFORMANCE OF CONSTRUCTION PROJECTS BY INTEGARATING RISK INTO EARNED VALUE MANAGEMENT: ALITURATURE REVIEW
نویسندگان
چکیده
The actual cost and time of the construction projects are different from planned. Cost overruns critical issues. Therefore, these highlight importance monitor control phase for project's success, So project needs to elements as time, cost, scope, in addition risks, where face more risks. Earned value management (EVM) is a technique evaluating performance, used early tracking indicate that on planned estimated or not. Risk considered part EVM process. Value Management risk (RM) two popular techniques performance. main objective this paper improve performance by integrating into Management. Achieving aim shall help managers take corrective actions. In order achieve paper, present literature review, several chosen sources published during last decade were analyzed divided five categories: EVM, RM, Integration between Risk, Contingency Reserve (CR), Schedule (SR), Software. findings identified value-added applying integration guidelines process application. it recommends perspective with use accurate software تختلف التکلفة الفعلية والوقت لمشاريع التشييد عن المخطط لها. تجاوزالتکلفة من القضايا الحاسمة. لذلک فإن هذه التجاوزات تسلط الضوء على أهمية مرحلة المراقبة والتحکم لنجاح المشروع ، يحتاج إلى مراقبة عناصر فيها مثل الوقت والتکلفة والنطاق بالإضافة المخاطر حيث تواجه مشاريع البناء المزيد المخاطر. إدارة القيمة المکتسبة (EVM)هي تقنية لتقييم أداء تستخدم للتتبع المبکر للإشارة أن في له المقدرة أم لا. تعتبر جزءا عملية . (EVM)إدارة وإدارة (RM)هما طريقتان شائعتان تستخدمان لمراقبة فيه. الهدف الرئيسي لهذه الورقة هو تحسين خلال دمج المکتسبة. سيساعد تحقيق هذا مديري اتخاذ الإجراءات التصحيحية. أجل قدم مراجعة الأدبيات تم تحليل العديد مصادر المختارة المنشورة العقد الماضي وتم تقسيمها خمس فئات رئيسية: RM التکامل بين والمخاطر احتياطي طوارئ CR) )، الجدول (SR) البرامج حددت نتائج المضافة تطبيق والمبادئ التوجيهية العملية. توصي بدمج منظور مع استخدام برامج دقيقة لتحسين مشروع البناء.
منابع مشابه
The Cost Monitoring of Construction Projects Through Earned Value Analysis
In construction industry, the term ‘procurement’ is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase,...
متن کاملEarned - Value Management Terminology
To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...
متن کاملRisk Management in Construction Projects
The financial and economic crisis has had an adverse impact on the Lithuania’s economy and construction industry. The GDP of Lithuania grew slightly in 2010, in contrast to a decrease of 14.7% in 2009. Lithuania’s GDP increased from 1.3% in 2010 to 4.6% in 2011. Annual GDP growth decreased from its highest point of 6.7%, reached in the third quarter, to 4.4% in the last quarter of 2011 [1,2]. S...
متن کاملEstimation of Project Performance Using Earned Value Management and Fuzzy Regression
Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...
متن کاملRisk management in small construction projects
Risks and other uncertainties can cause losses, which lead to increasing costs and time delays,both during the project and at the end. The need to prevent failures during the constructionprocess and other losses related to construction has been emphasised in various reports.Example consequences are failure costs in civil works which can be close to 8% of the totalbudget for proj...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Al-Azhar University Engineering Sector
سال: 2021
ISSN: ['1687-8418']
DOI: https://doi.org/10.21608/auej.2021.187983