Improving Labour Productivity in Ghanaian Building Construction Projects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Loss in Productivity in Relation with Delay Analysis in Building Construction Projects

Schedule delays commonly occur in construction projects and often result in delay and low productivity. Several studies have proposed different schedule delay analysis methodologies. By using asplanned and as-built schedules most studies have concentrated on calculating and identifying the delay events on project but have neglected the low productivity. Loss in productivity, which is a primary ...

متن کامل

Modeling construction time in Spanish building projects

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. ...

متن کامل

Factors Affecting Labour Productivity in the Construction Industry

Much research in the area of construction productivity focussed on the factors affecting labour. However, these studies tend to look at the factors in isolation and thus were inadequate in the recommendations for productivity improvements. This is because labour productivity is a complex and multifaceted issue. Given the recent industrial initiatives of Rethinking Construction and Respect for P...

متن کامل

reliabilty assessment of conceptual cost estimates for building construction projects

in the early stages of a construction project, the reliability and accuracy of conceptual cost estimates are major concerns for clients and cost engineers. previous studies applied scoring methods and established common rules or mathematical methods to assess the quality of cost estimates. however, those approaches have some limitations in adapting to real-world projects or require understandin...

متن کامل

Merging Building Automation Network Design and IFC 2x Construction Projects

Currently, different design tools and databases are used for building automation networks and construction projects. Effort (design time, tools) can be reduced if these two design spaces can be merged. In this paper an approach for the integration of building automation network design in IFC 2x is introduced. Based on the resulting model, existing tools are to enhance in order to accomplish a h...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Baltic Journal of Real Estate Economics and Construction Management

سال: 2020

ISSN: 2255-9671

DOI: 10.2478/bjreecm-2020-0011