Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Approach to Scheduling with Earliness and Tardiness Costs

A hybrid technique using constraint programming and linear programming is applied to the problem of scheduling with earliness and tardiness costs. The linear model maintains a set of relaxed optimal start times which are used to guide the constraint programming search heuristic. In addition, the constraint programming problem model employs the strong constraint propagation techniques responsibl...

متن کامل

Preemption in Single Machine Earliness/Tardiness Scheduling

We consider a single machine earliness/tardiness scheduling problem with general weights, ready times and due dates. Using completion time information obtained from the optimal solution to a preemptive relaxation, we generate feasible solutions to the original non-preemptive problem. We report extensive computational results demonstrating the speed and effectiveness of this approach.

متن کامل

Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs

W e consider multimachine scheduling problems with earliness and tardiness costs. We first analyze problems in which the cost of a job is given by a general nondecreasing, convex function F of the absolute deviation of its completion time from a (common) unrestrictive duedate, and the objective is to minimize the sum of the costs incurred for all N jobs. (A special case to which considerable at...

متن کامل

Machine scheduling with earliness, tardiness and non-execution penalties

The study of scheduling problems with earliness–tardiness (E/T) penalties is motivated by the just-in-time (JIT) philosophy, which supports the notion that earliness, as well as tardiness, should be discouraged. In this work, we consider several scheduling problems. We begin by generalizing a known polynomial time algorithm that calculates an optimal schedule for a given sequence of tasks, on a...

متن کامل

A Case Study on Earliness/Tardiness Scheduling by Constraint Programming

The aim of this paper is to solve a problem on scheduling with earliness and tardiness costs using constraint programming approach, and to compare the results with the ones from the original timed automata approach. The case study, a production of lacquers, includes some real life features like operating hours or changeover times. Considering the earliness and tardiness costs of the case study,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Industrial Engineering Computations

سال: 2019

ISSN: 1923-2926,1923-2934

DOI: 10.5267/j.ijiec.2019.2.001