Improving Construction Management of an Educational Center by Applying Earned Value Technique

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

DELIVER! - An educational game for teaching Earned Value Management in computing courses

Context: To meet the growing need for education in Software Project Management, educational games have been introduced as a beneficial instructional strategy. However, there are no low-cost board games openly available to teach Earned Value Management (EVM) in computing programs. Objective: This paper presents an educational board game to reinforce and teach the application of EVM concepts in t...

متن کامل

An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...

متن کامل

Improving Performance of Customer Relationship Management through Applying Knowledge Management

Customer Relationship Management (CRM) and Knowledge Management (KM) have become especial and strategic keys in the current competitive environment for all companies.  The critical role of KM as the main determinant of the success of CRM has been the focal point of the previous researches; the present paper aimed at studying the impact of different KM factors- such as Customer Knowledge (CK), S...

متن کامل

The Cost Monitoring of Construction Projects Through Earned Value Analysis

In construction industry, the term ‘procurement’ is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Engineering

سال: 2011

ISSN: 1877-7058

DOI: 10.1016/j.proeng.2011.07.244