The blocking flow-shop scheduling problem, which is an NP-hard has wide applications in industry. Many studies have focused primarily on single-objective optimization, such as minimizing the makespan or total flow time, insufficient for practical problems. In this study, a problem with bicriteria of and machine utilization considered. A simple constructive heuristic, NEHCG, proposed by developing new priority tie-breaking rules based Nawaz–Enscore–Ham heuristic. rule, quartile deviation job processing times included first rule designed to break ties effectively insertion phase. Then, improved PW_NEHCG, presented combining NEHCG profile-fitting approach. Computational experiments show that heuristics exhibit excellent performance compared other well-known heuristics.
منابع مشابه
A new Nawaz–Enscore–Ham-based heuristic for permutation flow- shop problem with bicriteria of makespan and machine idle-time
متن کامل
Efficient heuristic algorithms for the blocking flow shop scheduling problem with total flow time minimization
This paper proposes two constructive heuristics, i.e. HPF1 and HPF2, for the blocking flow shop problem in order to minimize the total flow time. They differ mainly in the criterion used to select the first job in the sequence since, as it is shown, its contribution to the total flow time is not negligible. Both procedures were combined with the insertion phase of NEH to improve the sequence. H...
متن کاملAn Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملImprovement Tools for NEH Based Heuristics on Permutation and Blocking Flow Shop Scheduling Problems
In this paper, two tools to improve the performance of the NEHbased heuristics for the flow shop problem with and without buffer constraints are proposed. The first tool is the use of the reversibility property of the problems considered and the second one is a new tie-breaking strategy to be use in the insertion phase of the NEH heuristic. In addition, we have analyzed the behavior of five ini...
متن کاملAn Efficient Iterated Greedy Algorithm for the Makespan Blocking Flow Shop Scheduling Problem
We propose in this paper a Blocking Iterated Greedy algorithm (BIG) which makes an adjustment between two relevant destruction and construction stages to solve the blocking flow shop scheduling problem and minimize the maximum completion time (makespan). The greedy algorithm starts from an initial solution generated based on some well-known heuristic. Then, solutions are enhanced till some stop...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Engineering Optimization
سال: 2021
ISSN: ['1029-0273', '0305-215X', '1026-745X']
DOI: https://doi.org/10.1080/0305215x.2021.2010727