Implementation of Earned Value Management in Unit-Price Payment Contracts

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

Important Factors for Organizational Performance Evaluation through Implementation of Earned Value Management (EVM) in North Taiwan

In order to cope with the rapid changes in the world, enterprises utilize project management methodology to globally outsource their works and to evaluate their internal and external work performance. Of all the project management techniques, Earned Value Management (EVM) is the major one that provides a method to evaluate project performance by integrating schedule and cost of work packages. E...

متن کامل

Analysis and Application of Earned Value Management in Software Development

Earned Value Management (EVM) is a well-known cost and schedule management technique in government and defense industry projects. Its usage, however, is not as wide spread in the general software industry. In this paper we explore some of the shortcomings in EVM and suggest several improvements in the application of EVM in software development projects. In particular, we analyze the nature of s...

متن کامل

Keyword Auctions, Unit-Price Contracts, and the Role of Commitment

Motivated by the enormous growth of keyword advertising, this paper explores the design of performance-based unitprice contract auctions, in which bidders bid their unit prices and the winner is chosen based on both their bids and performance levels. The previous literature on unit-price contract auctions usually considers a static case where bidders’ performance levels are fixed. This paper st...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Management in Engineering

سال: 2017

ISSN: 0742-597X,1943-5479

DOI: 10.1061/(asce)me.1943-5479.0000500