Implementação de last planner

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Projeto E Implementação De Um Processador Virtual De Comunicação

of Thesis presented to COPPE as partia1 fulfillment of the requirements for the degree of Master of Science (M. Sc.) Project and Implementation of a Communication Virtual Processor Lúcia Maria de Assumpção Drurnrnond August, 1990 Thesis Supervisor: Valmir C. Barbosa Department: Programa de Engenharia de Sistemas e Computação Distributed systems of the MIMD kind for parallel processing represent...

متن کامل

Implementação e Utilização de Maquete Tátil Sonora por Pessoas Cegas

—The association of robotic devices with computer s increases the potential of the infor mation and communication technologies ­ ICT. However, just like PCs, most robotic devices interfaced with computers, are not designed for the use of impaired individuals. The sound­tactile model is among the appliances under development by the pedagogic robotics group from Nied/ Unicamp (the Campinas Stat e...

متن کامل

Implementação em Java de um Algoritmo de Árvore de Decisão Acoplado a um SGBD Relacional

Nowadays one of the most researched topics in data mining is its integration with database. The reflexes of these efforts already appear in the major commercial databases, which are supplying integrated solutions of data mining. This work evaluates the coupling of an unusual decision tree algorithm to a relational database management system, and analyzes the performance of the implementation in...

متن کامل

Proposta de implementação de redes de base radial em tecnologias CMOS e BiCMOS

In this work, we present the development of radial basis function circuits in CMOS technology. Two one-dimensional circuits, namely RBF1 and RBF2, are proposed for radial basis function realization, and their functionality is demonstrated by SPICE simulations and by their implementation with commercial MOSFET array integrated circuits. Multidimensional capability is demonstrated by the implemen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Revista dos Trabalhos de Iniciação Científica da UNICAMP

سال: 2019

ISSN: 2596-1969

DOI: 10.20396/revpibic262018952