IMPACT OF UNCERTAINTY IN A MULTI-STAGE STOCHASTIC PRODUCTION MODEL

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Distributed Generation Expansion Planning Considering Load Growth Uncertainty: A Novel Multi-Period Stochastic Model

Abstract – Distributed generation (DG) technology is known as an efficient solution for applying in distribution system planning (DSP) problems. Load growth uncertainty associated with distribution network is a significant source of uncertainty which highly affects optimal management of DGs. In order to handle this problem, a novel model is proposed in this paper based on DG solution, consideri...

متن کامل

A Markov Model to Determine Optimal Equipment Adjustment in Multi-stage Production Systems Considering Variable Cost

Our aim is to maximize expected profit per item of a multi-stage production system by determining best adjustment points of the equipments used based on technical product specifications defined by designer. In this system, the quality characteristics of items produced should be within lower and higher tolerance limits. When a quality characteristic of an item either falls beneath the lower li...

متن کامل

Multi-Objective Scheduling Problem in a Three-Stage Production System

A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines a...

متن کامل

A multi-stage stochastic programming for condition-based maintenance with proportional hazards model

Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...

متن کامل

Multi-stage Stochastic Programming Models in Production Planning

Production planning is a key area of operations management. An important methodology for production planning is mathematical programming. Traditional mathematical programming models for production planning are deterministic, and cannot provide robust production plans in the presence of uncertainty. As such, deterministic planning models may yield unsatisfactory decisions. Stochastic programming...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: DYNA

سال: 2020

ISSN: 1989-1490

DOI: 10.6036/9813