Impact of Cost Control Techniques on Cost Overruns in Construction Projects

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Study on Construction Cost of Construction Projects

China is a country which has the largest investment amount in engineering construction in the world and which has the most construction projects. It is a significant subject for the extensive engineering managers to have effective engineering cost management in construction project management and to reasonably determine and control construction cost on the condition of ensuring construction qua...

متن کامل

Assessment of delays and cost overruns during construction projects in Pakistan

Construction projects are commonly delayed due to price escalation of building materials and faulty management in Pakistan. This research paper focused on the main reasons of delay and cost overruns. This research activity was exclusively assessed through questionnaire survey, interviews, field visits and discussion to the concerned authorities. A preplanned survey was conducted through a quest...

متن کامل

Investigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects

Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...

متن کامل

Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia

Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing...

متن کامل

Construction Cost Overruns in Electric Utilities: Some Trends and Implications

FOREWORD The bylaws of the National Regulatory Research Institute state that among the purposes of the Institute is: ... to carry out research and related activities directed to the needs of state regulatory commissioners, to assist the state commissions with developing innovative solutions to state regulatory problems, and to address regulatory issues of national concern. This study· the third...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineer: Journal of the Institution of Engineers, Sri Lanka

سال: 2017

ISSN: 2550-3219,1800-1122

DOI: 10.4038/engineer.v50i4.7275