Identification of Dam Construction Risks to Job Owners (Dam Construction in East Java)

نویسندگان

چکیده

Approach to risk management, knowing the potential risks in realizing construction of dam on side work owner East Java area. In constructing a dam, job can affect project's success. A practical management approach is carried out achieve schedule, cost, quality, and service. This research aims identify provide priority order for project that are most likely occur minimize consequences arising from these risks. The identified will then be researched using Failure Mode Effect Analysis (FMEA) method. Then, highest sequence obtained determine appropriate response addressing next construction, know significant cost overruns, time, quality.

منابع مشابه

Zolqarnein’s Dam Construction

The Holy Quran is God’s miracle and its scientific miracle aspects or wonders have been recognized by development of human scientific abilities. Stating the story of Zolqarnein and dam construction by him, verses 83 to 98 of Al-Kahf have pointed to some scientific points and facts regarding safety industry, impenetrability and consolidation of iron through putting a coating of copper on its sur...

متن کامل

Dam Safety During Design, Construction and Operation

Introduction In the foreword to the Malaysian Guidelines for Operation, Maintenance and Surveillance of Dams (Malaysian Inter-Departmental Committee on Dam Safety 1989), it is stated “The expanding inventory of dams has brought into focus the subject of dam safety”. At the time of the guideline publication, there had been a considerable increase in the inventory of dams with those constructed d...

متن کامل

Optimization of time and temperature of dam construction for thermal analysis of RCC dam

In RCC dams, usually large amounts of concrete are poured in a short time that the heat generated by the cement hydration has led to an increase in temperature in the dam body. In this research, Abacus software, which is a finite element software, has been used for thermal analysis of the dam during construction and concreting. This is how thermal changes are applied. For the structure of 50 c...

متن کامل

Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of mechanical, civil and industrial engineering

سال: 2023

ISSN: ['2710-1436']

DOI: https://doi.org/10.32996/jmcie.2023.4.2.4