Hyper Heuristic for Solving Quay Crane Scheduling Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem

Decision makers must face the dynamism and uncertainty of real-world environments when they need to solve the scheduling problems. Different incidences or breakdowns, for example, initial data could change or some resources could become unavailable, may eventually cause the infeasibility of the obtained schedule. To overcome this issue, a robust model and a proactive approach are presented for ...

متن کامل

An Estimation of Distribution Algorithm for Solving the Quay Crane Scheduling Problem with Availability Constraints

This work addresses the Quay Crane Scheduling Problem under availability constraints, whose main goal is to determine the work schedules of the quay cranes allocated to a container vessel in order to carry out its transhipment operations (loading and unloading operations). An Estimation of Distribution Algorithm with shaking procedure is proposed to solve it. The position of the tasks and the o...

متن کامل

A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach

Keywords: Quay crane assignment Quay crane scheduling Genetic algorithms Integrated models a b s t r a c t This paper presents a new approach to analyze the integrated quay crane assignment and scheduling problem (QCASP). The problem determines the assignment of quay cranes to vessels and the sequence of tasks to be processed by each quay crane simultaneously, and accounts for important conside...

متن کامل

An evolutionary approach to solving a new integrated quay crane assignment and quay crane scheduling mathematical model

This paper puts forward an integrated optimisation model that combines two distinct problems arising in container terminals, namely the Quay Crane Assignment Problem, and the Quay Crane Scheduling Problem. The model is of the mixed-integer programming type with the objective being to minimise the tardiness of vessels. Although exact solutions can be found to the problem using Branch-and-Cut, fo...

متن کامل

Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals

In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Southwest Jiaotong University

سال: 2019

ISSN: 0258-2724

DOI: 10.35741/issn.0258-2724.54.3.14