Hydroelectric power plant management relying on neural networks and expert system integration
نویسندگان
چکیده
منابع مشابه
Unsupervised Neural Network for Forecasting Alarms in Hydroelectric Power Plant
Power plant management relies on monitoring many signals that represent the technical parameters of the real plant. The use of neural networks (NN) is a novel approach that can help to produce decisions when integrated in a more general system. In this paper we introduce a NN module using an ART-MAP to discriminate different situations from the plant in order to prevent future malfunctions. A s...
متن کاملAn Overview of Hydroelectric Power Plant: Operation, Modeling, and Control
Renewable energy provides twenty percent of electricity generation worldwide. Hydroelectric power is the cheapest way to generate electricity today. It is a renewable source of energy and provides almost one-fifth of electricity in the world. Also, it generates electricity using a renewable natural resource and accounting for six percent of worldwide energy supply or about fifteen percent of th...
متن کاملEvolving neural networks to play checkers without relying on expert knowledge
An experiment was conducted where neural networks compete for survival in an evolving population based on their ability to play checkers. More specifically, multilayer feedforward neural networks were used to evaluate alternative board positions and games were played using a minimax search strategy. At each generation, the extant neural networks were paired in competitions and selection was use...
متن کاملDesigning an Expert System for Credit Rating of Real Customers of Banks Using Fuzzy Neural Networks
Currently, in Iran's banking system, non-repayment of facilities has become one of the biggest issues, and due to the lack of a proper system for proper allocation of facilities, they face a number of problems, including the problem of allocation of loans, the problem of failure to repay loans Of the central bank, or the amount of facilities increased from the amount of reimbursement. The solut...
متن کاملMethodology for the Building of a Fuzzy Expert System for Predictive Maintenance of Hydroelectric Power Plants
The aim of this study is giving continuity to the evolution of the SIMPREBAL methodology and computer system based on the specification OSA-CBM (Open System Architecture for Condition Based Maintenance). The operation of the SIMPREBAL (Predictive Maintenance System of Balbina) system mainly is based on the collection and analysis of the monitored physics variables in hydroelectric power plants,...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Engineering Applications of Artificial Intelligence
سال: 2000
ISSN: 0952-1976
DOI: 10.1016/s0952-1976(00)00009-9