Hybrid Twin Simulation Technology for Training and Testing of New Generation Substation Secondary System

نویسندگان

چکیده

Abstract In this paper, a hybrid twin scheme for power substations is proposed secondary system simulation, which can be used to support operator training and equipment testing. The composed of hardware-in-the-loop (HIL) based substation digital reflect the real operating status both primary systems substation. Based on scheme, modeling method architecture are studied in paper. According substation, testing conducted new-generation with fewer costs security risks.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

simulation and design of electronic processing circuit for restaurants e-procurement system

the poor orientation of the restaurants toward the information technology has yet many unsolved issues in regards to the customers. one of these problems which lead the appeal list of later, and have a negative impact on the prestige of the restaurant is the case when the later does not respond on time to the customers’ needs, and which causes their dissatisfaction. this issue is really sensiti...

15 صفحه اول

Application and Research of Kinect Motion Sensing Technology on Substation Simulation Training System

The coming forth of kinect technology has enabled trainers controlling cruise and operation in 3D scene by their action, but this technology isn’t applied to electric power training field yet, because this field includes many electric devices and operation regulations. This paper has firstly described the electric operation regulations as one set of operation patterns by using finite state mach...

متن کامل

simulation and experimental studies for prediction mineral scale formation in oil field during mixing of injection and formation water

abstract: mineral scaling in oil and gas production equipment is one of the most important problem that occurs while water injection and it has been recognized to be a major operational problem. the incompatibility between injected and formation waters may result in inorganic scale precipitation in the equipment and reservoir and then reduction of oil production rate and water injection rate. ...

Development of a compression system dynamic simulation code for testing and designing of anti-surge control system

In recent years, several research activities have been conducted to develop knowledge in analysis, design and optimization of compressor anti-surge control system. Since the anti-surge control testing on a full-scale compressor is limited to possible consequences of failure, and also the experimental facility can be expensive to set up control strategies and logic, design process often involves...

متن کامل

A New Hybrid Heuristic Technique for Unit Commitment and Generation Scheduling

This paper proposes a novel technique for solving generation scheduling and ramp rate constrained unit commitment. A modified objective function associated with a new start-up cost term is introduced in this paper. The proposed method is used to solve generating scheduling problem satisfying SRR, minimum up and down time as well as ramp rate constraints. Two case studies are conducted to imp...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of physics

سال: 2023

ISSN: ['0022-3700', '1747-3721', '0368-3508', '1747-3713']

DOI: https://doi.org/10.1088/1742-6596/2588/1/012019