Hybrid Management Methodology for Transport Projects Related to Rolling Stock

نویسندگان

چکیده

Dynamic economic development and the fast implementation pace of innovative, economical solutions force companies to continue finding methods increasing efficiency their operations. One ways increase effectiveness activities is use a project approach that allows achieving all set goals efficiently. The gaining popularity due its high efficiency. Also, it treated as separate trend called “projectification” “project orientation”. article defines what management methodology are. specificity railway transport projects concerning rolling stock was characterized. elements traditional agile methodologies were described, indicating differences. Project areas selected in which easiest fastest carry out.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Conceptual Methodology for Transportation Projects Selection

  Selection of appropriate infrastructure transportation projects such as highways, plays an important role in promotion of transportation systems. Usually in evaluation of transportation projects, because of lack of information or due to long time and high expenditures needed for gathering information, different effective factors are ignored. Thus, in this research, regarding multi criteria na...

متن کامل

A rolling horizon approach for disruption management of railway rolling stock

This paper deals with real-time disruption management of rolling stock in passenger railway transportation. We describe a generic framework for dealing with disruptions of railway rolling stock schedules. The framework is presented as an online combinatorial decision problem, where the uncertainty of a disruption is modeled by a sequence of information updates. To decompose the problem and to r...

متن کامل

Recoverable Robustness for Railway Rolling Stock Planning

In this paper we explore the possibility of applying the notions of Recoverable Robustness and Price of Recoverability (introduced by [5]) to railway rolling stock planning, being interested in recoverability measures that can be computed in practice, thereby evaluating the robustness of rolling stock schedules. In order to lower bound the Price of Recoverability for any set of recovery algorit...

متن کامل

Rolling stock technology for the future

The paper presents a vision for future rolling stock with a timescale of 30-50 years to identify the key changes that are likely to be influential, in particular to meet the challenges associated with the UK’s ambitious technical strategy. Overall it suggests the authors’ vision for future rolling stock, not necessarily as a perfect prediction, but certainly to highlight the main possibilities....

متن کامل

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: ?????? ?????????? ????

سال: 2021

ISSN: ['0042-1294', '1996-6652']

DOI: https://doi.org/10.21272/jes.2021.8(2).b2