Hundreds of Years of Pain, With Minimal Gain: Capital Project Cost Overruns, the Past, Present, and Optimistic Future

نویسندگان

چکیده

The cost overrun phenomenon plagues capital projects worldwide. While policymakers and practitioners are aware of the potential for overruns to occur while procuring their projects, they have struggled mitigate them. This article takes stock research suggests two major periods stand out. First, it focuses on period from 1960 2002 briefly reviews studies examining issues influencing estimation accuracy. Then, we look at present (2002–2022), where Planning Fallacy theory has been championed identified as best way explain why occur. filled theoretical void in literature, question its legitimacy unable effectively address phenomenon. Moving forward, suggest a line inquiry based polyphony “Fifth Hand” principle, which offers new framing remedy projects.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

15 Years of Explaining Pain - The Past, Present and Future

screening23RCTS13RCTS 2010 onwards9 MAN US CR IP TAC CE PTEDACCEPTED MANUSCRIPT AuthorsYear TitleAbstractJournalPagesYES/NOR. E. Johnson, G. T. Jones, N. J.Wiles, C. Chaddock, R. G. Potter, C.Roberts, D. P. Symmons, P. J.Watson, D. J. Torgerson and G. J.Macfarlane2007 Active exercise, education, andcognitive beh...

متن کامل

Mizaj past, present and future

Temperament (Mizaj), as an individual factor, has great importance in traditional medicine and its use in diagnosis and treatment of diseases, as well as the individual lifestyle is very common. Since medicine moves toward Personalized Medicine, the root of individual differences will find its position in different aspects of medicine in early future. In traditional medicine, temperament is ...

متن کامل

Tuberculosis: Past, Present and Future

  Background Tuberculosis (TB) is the second-most common cause of death from infectious disease (after those due to HIV/AIDS). Roughly one-third of the world's population has been infected with M. tuberculosis, with new infections occurring in about 1% of the population each year. People with active TB can infect 10-15 other people through close contact over the course of a year. Materials and ...

متن کامل

ERIC: Past, Present, Future

This article has no abstract.

متن کامل

Teachers’ Professional Competencies: Past, Present, and Future

Teachers’ Professional Competencies: Past, Present, and Future   M. Rezaai, Ph.D.*   The purpose of this paper is to review the expected professional competencies throughout the history of teacher training in Iran. As such it covers both the past, covering the period from teacher training inception in 1918 to the Islamic revolution in 1979; and the present, since the revolution. Of course t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Engineering Management Review

سال: 2022

ISSN: ['0360-8581', '1937-4178']

DOI: https://doi.org/10.1109/emr.2022.3219362