How to monitor and adjust in real time the total water consumption and water use efficiency: Earned value method

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Maize response to water, salinity and nitrogen levels: yield-water relation, water-use efficiency and water uptake reduction function

Water, salinity and nitrogen are the major factors affecting maize production in arid and semi-arid areas. The objectives of this study were to investigate the effects of different water, salinity and nitrogen levels on yield-water relationships, water use, water productivity (WP), water use efficiency (WUE) and water uptake reduction function by maize hybrid SC-704 in a semi-arid area and ...

متن کامل

How energy and water availability constrain vegetation water-use along the North Australian Tropical Transect

Energy and water availability were identified as the first order controls of evapotranspiration(ET) in ecohyrodrology. With a ~1,000 km precipitation gradient and distinct wet-dry climate,the North Australian Tropical Transect (NATT) was well suited for evaluating how energy andwater availabilities constrain water use by vegetation, but has not been done yet. In this study,we addressed this que...

متن کامل

on the relationship between self- regulated learning strategies use and willingness to communicate in the context of writing

این تحقیق به منظور بررسی رابطه بین میزان استراتژیهای خود-تنظیم شده یادگیری و تمایل به ایجاد ارتباط دانشجویان زبان انگلیسی انجام شده است.علاوه بر این،روابط و کنش های موجود بین ریزسنجه های استراتژیهای خود-تنظیم شده یادگُیری ، مهارت نگارش و تمایل به برقراری ارتباط و همچنین تاٍثیرجنسیت دانشجویان زبان انگلیسی در استراتژیهای خود-تنظیم شده یادگیری و تمایل به برقراری ارتباط آنها مورد بررسی قرار گرفته شد.

15 صفحه اول

simulation and experimental studies for prediction mineral scale formation in oil field during mixing of injection and formation water

abstract: mineral scaling in oil and gas production equipment is one of the most important problem that occurs while water injection and it has been recognized to be a major operational problem. the incompatibility between injected and formation waters may result in inorganic scale precipitation in the equipment and reservoir and then reduction of oil production rate and water injection rate. ...

identifying the strategies persian efl learners use in reading an expository text in english and examining its relation to reading-proficiency and motivation: a think-aloud study

هدف اصلی از این مطالعه بررسی نوع و میزان استراتژی هایی بود که دانشجویان فارسی زبان رشته ی زبان انگلیسی در حین خواندن یک متن انگلیسی به کار گرفتند. این مطالعه همچنین به بررسی تفاوت های استراتژی های مورد استفاده بین دارندگان سطح بالا و پایین درک مطلب پرداخت. نوع همبستگی بین استراتژی به کار گرفته و درک مطلب از یک سو و استراتژی به کار گرفته و انگیزه از سوی دیگر نیز در این تحقیق مورد آزمایش قرار گرف...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Earth and Environmental Science

سال: 2017

ISSN: 1755-1307,1755-1315

DOI: 10.1088/1755-1315/59/1/012062