High-current Pulsed Accelerator with Matching Transformer: Construction and Exploitation Characteristics
نویسندگان
چکیده
منابع مشابه
A High Transformer Ratio Plasma Wakefield Accelerator Scheme for Facet∗
The ideal drive beam current profile for the plasma wakefield accelerator (PWFA) has been predicted by 1D and 2D simulations to be characterized by a triangular ramp that rises linearly from head to tail, followed by a sharp drop. A technique for generating such bunches experimentally was recently demonstrated. We present here an adaptation of this scheme to generate ramped bunches using the 23...
متن کاملMulti Gigawatt High Current Pulsed Electron Accelerator Technology Development Program at Barc
High current intense electron beams were investigated earlier for Flash X-rays and nuclear electromagnetic pulse generation. Starting with moderate parameters of 200 kV, 6 kA, 60 ns pulsed electron beam source from a system named Kilo Ampere Linear Injector (KALI-75) our latest development is KALI-30 GW system rated for 1 MV, 30 kA, 80 ns. First repetitive pulse LINAC without spark gap switchin...
متن کاملMitigation Transformer Inrush Current Using Modified Transient Current Limiter
This study presents a modified transient current limiter (MTCL) for mitigation the inrush current of transformers. The MTCL is based on conventional transient current limiter (TCL), which, its configuration is modified to overcome the TCL drawbacks of operation. The proposed MTCL offers lower power losses and voltage/current THD during normal operation mode. It needs only one limiting reactor i...
متن کاملArc Shape Characteristics with Ultra-High-Frequency Pulsed Arc Welding
Arc plasma possesses a constriction phenomenon with a pulsed current. The constriction is created by the Lorentz force, the radial electromagnetic force during arc welding, which determines the energy distribution of the arc plasma. Welding experiments were carried out with ultra-high-frequency pulsed arc welding (UHFP-AW). Ultra-high-speed camera observations were produced for arc surveillance...
متن کاملSpiral2 Accelerator Construction Progress
The installation of the SPIRAL2 superconducting accelerator at GANIL is almost started. All the major components have been tested in the various partner laboratories, and the building construction is now well engaged. The management of the interfaces between the process and the buildings is a strategic point in an underground accelerator, with strong space constraints. This paper describes the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEJ Transactions on Fundamentals and Materials
سال: 2004
ISSN: 0385-4205,1347-5533
DOI: 10.1541/ieejfms.124.491