Heuristics for project scheduling with discounted cash flows optimisation
نویسندگان
چکیده
منابع مشابه
Resource Investment Problem with Discounted Cash Flows
A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered as decision variables and the goal is to find a schedule, and resource requirement levels, such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash fl...
متن کاملResource Investment Problem With Discounted Cash Flows
A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered decision variables and the goal is to find a schedule and resource requirement levels such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash flows. ...
متن کاملFour Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows
In this paper, the multi-mode resource constrained project scheduling problem with discounted cash flows is considered. The objective is the maximization of the net present value of all cash flows. Time value of money is taken into consideration, and cash inand outflows are associated with activities and/or events. The resources can be of renewable, nonrenewable, and doubly constrained resource...
متن کاملProj ect Scheduling with Discounted Cash Flows and Progress Payments
In all large scale projects, there correspond cash flows that incur throughout the life of the project. The scheduling of these projects to maximize the present value of the cash flows has been a topic of recent research. The basic assumption of earlier research is that the cash flows are mainly associated with some events of the project and they occur at the event realization times. However, i...
متن کاملSolving a multi-objective multi-mode resource-constrained project scheduling problem with discounted cash flows
This paper presents a multi-objective multi-mode resource-constrained project scheduling problem (MRCPSP) with positive and negative cash flows. We consider the objectives of the net present value (NPV) maximization and robustness maximization along by makespan minimization. Furthermore, to make a model close to the real world situations, two types of commonly used payment models are considered...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Bulletin of the Polish Academy of Sciences Technical Sciences
سال: 2015
ISSN: 2300-1917
DOI: 10.1515/bpasts-2015-0072