Helicopter Hoist Performance in Novice and Experienced Hoist Operators

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Frequency control of crane hoist speed

The voltage of the stator is usually controlled with thyristors. To ensure stable control of the load, the control system requires information about the motor speed. Up to now, tachometers or encoders have been used to measure the motor speed, however, tachometers, with their associated equipment, tend to be mechanically sensitive and are often difficult to install, due to space constraints. Th...

متن کامل

Multicyclic hoist scheduling with constant processing times

This paper proposes an exact algorithm for the multicyclic schedules of hoist moves in a printed circuit board (PCB) electroplating facility, where exactly ( 1) parts enter and parts leave the production line during each cycle, and the processing time at each production stage is a given constant. The multicyclic scheduling problem is transformed into enumeration of intervals for linear function...

متن کامل

A Generic Model and Hybrid Algorithm for Hoist Scheduling Problems

This paper presents a robust approach to solve Hoist Scheduling Problems (HSPs) based on an integration of Constraint Logic Programming (CLP) and Mixed Integer Programming (MIP). By contrast with previous dedicated models and algorithms for solving classes of HSPs, we deene only one model and run diierent solvers. The robust approach is achieved by using a CLP formalism. We show that our models...

متن کامل

Hoist Scheduling Problem in a Real Time Context

An electroplating, or chemical treatment, line is composed of (see fig 1) : tanks containing each a chemical reagent, an input and an output buffer, hoists transporting the products from tank to tank. Therefore, a treatment results from the successive immersion of a product in several tanks. Tanks and hoists can only process one job at a time. Specific chemical constraints exist : • once a prod...

متن کامل

An Improved Hybrid Model for the Generic Hoist Scheduling Problem

The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines. In recent work using the constraint logic programming (CLP) formalism, a unified model has been developed with the problem description and solution method separated. We provide an improved model and new preprocessing stages where, as before, solutions and proof of optimality are provided by a hybrid C...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Aerospace Medicine and Human Performance

سال: 2020

ISSN: 2375-6314

DOI: 10.3357/amhp.5516.2020