Hardware Genetic Algorithm Optimization by Critical Path Analysis using a Custom VLSI Architecture

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Real-Time Face Recognition System Using Custom VLSI Hardware

A real-time face recognition system has been implemented on an IBM compatible personal computer with a video camera, image digitizer, and custom VLSI image correlator chip. With a single frontal facial image under semi-controlled lighting conditions, the system performs (i) image preprocessing and template extraction, (ii) template correlation with a database of 173 images, and (iii) postproces...

متن کامل

A Genetic Algorithm Hardware Accelerator for VLSI Circuit Partitioning

In recent years there has been a great interest in accelerating time consuming algorithms that solve large combinatorial optimization problems [1]. The advent of high density field programmable gate arrays in combination with efficient synthesis tools have enabled the production of custom machines for such difficult problems. Genetic Algorithms (GAs) [13] are robust techniques based on natural ...

متن کامل

Path Planning Optimization Using Genetic Algorithm – A Literature Review

Motion planning is a term used in robotics for the process of detailing a task into discrete motions. It is a process to compute a collision-free path between the initial and final configuration for a rigid or articulated object (the "robot") among obstacles. It is aimed at enabling robots with capabilities of automatically deciding and executing a sequence motion in order to achieve a task wit...

متن کامل

The Urban Path Routing Adjustable Optimization by Means of Wavelet Transform and Multistage Genetic Algorithm

This paper introduces the optimization algorithm to improve search rate in urban path routing problems using viral infection and local search in urban environment. This algorithm operates based on two different approaches including wavelet transform and genetic algorithm. The variables proposed by driver such as degree of difficulty and difficulty traffic are of the essence in this technique. W...

متن کامل

STRUCTURAL OPTIMIZATION USING A MUTATION-BASED GENETIC ALGORITHM

The present study is an attempt to propose a mutation-based real-coded genetic algorithm (MBRCGA) for sizing and layout optimization of planar and spatial truss structures. The Gaussian mutation operator is used to create the reproduction operators. An adaptive tournament selection mechanism in combination with adaptive Gaussian mutation operators are proposed to achieve an effective search in ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: South African Computer Journal

سال: 2015

ISSN: 2313-7835,1015-7999

DOI: 10.18489/sacj.v56i1.275