Hard rock tunnel boring machine penetration test as an indicator of chipping process efficiency
نویسندگان
چکیده
منابع مشابه
Factors influencing performance of hard rock tunnel boring machines
Intact rock properties together with rock mass characteristics should be well investigated for selection of proper tunnel boring machine (TBM) for tunneling in various ground conditions. This is due to the significant impact of rock mass characteristics on machine performance. TBMs are site specific and designed for optimal performance in given ground conditions. When selected and put to work a...
متن کاملSimulation Analysis of Rock Braking Mechanism of Tunnel Boring Machine
Original scientific paper Aiming at answering the questions of wear and failure of hob in the rock breaking process, the rock breaking process was simulated in different broken rock conditions by using finite element method. The relationship between normal force, lateral force, rolling force and time was obtained by rock breaking simulation analysis on the single edge disc cutter. The rock stre...
متن کاملTUNNEL BORING MACHINE PENETRATION RATE PREDICTION BASED ON RELEVANCE VECTOR REGRESSION
key factor in the successful application of a tunnel boring machine (TBM) in tunneling is the ability to develop accurate penetration rate estimates for determining project schedule and costs. Thus establishing a relationship between rock properties and TBM penetration rate can be very helpful in estimation of this vital parameter. However, this parameter cannot be simply predicted since there ...
متن کاملSimulation of tunnel boring machine utilization: A case study
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...
متن کاملthe reliability of a tunnel boring machine
greater levels of complexity in tunnelling with tunnel boring machine (tbm) allow higher chances of failures that may increase the potential hazardous risks. this paper presents the results of a study on tbm reliability using risk analysis. machinery failure mode and effect analysis was applied to analyze the risks of a tbm using qs9000 and sae.j1739 recommendations. for this purpose, 48 failur...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Rock Mechanics and Geotechnical Engineering
سال: 2017
ISSN: 1674-7755
DOI: 10.1016/j.jrmge.2016.12.008