Group design-build-test projects as the core of an integrated curriculum in product design and development
نویسندگان
چکیده
منابع مشابه
Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon
Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...
متن کاملdevelopment and implementation of an optimized control strategy for induction machine in an electric vehicle
in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...
15 صفحه اولthe survey of the virtual higher education in iran and the ways of its development and improvement
این پژوهش با هدف "بررسی وضعیت موجود آموزش عالی مجازی در ایران و راههای توسعه و ارتقای آن " و با روش توصیفی-تحلیلی و پیمایشی صورت پذیرفته است. بررسی اسنادو مدارک موجود در زمینه آموزش مجازی نشان داد تعداد دانشجویان و مقاطع تحصیلی و رشته محل های دوره های الکترونیکی چندان مطلوب نبوده و از نظر کیفی نیز وضعیت شاخص خدمات آموزشی اساتید و وضعیت شبکه اینترنت در محیط آموزش مجازی نامطلوب است.
design of an analog fuzzy logic controller chip
fuzzy logic has been developed over the past three decades into a widely applied techinque in classification and control engineering. today fuzzy logic control is one of the most important applications of fuzzy set theory and specially fuzzy logic. there are two general approachs for using of fuzzy control, software and hardware. integrated circuits as a solution for hardware realization are us...
15 صفحه اولAn integrated system for duration estimation in design/build projects and organizations
Overruns to planned schedules are common in civil construction projects worldwide. Yet, the construction industry fails to recognize the criticality of the problem; and whilst models have been developed, their lack of adequate sophistication fails to alleviate the problem. Additionally, there is resistance from construction professionals to use such models due to the lack of software integratio...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Engineering Education
سال: 2010
ISSN: 1750-0052,1750-0044
DOI: 10.11120/ened.2010.05020050