Greedy algorithm for scheduling batch plants with sequence-dependent changeovers

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Greedy Algorithm for Scheduling Batch Plants with Sequence-Dependent Changeovers

This paper presents a new algorithm for the near optimal scheduling of multistage batch plants with a large number of orders and sequence-dependent changeovers. Such problems are either intractable when solved with full-space approaches or poor solutions result. We use decomposition on the entire set of orders and derive the complete schedule in several iterations, by inserting a couple of orde...

متن کامل

Two New Continuous-time Models for the Scheduling of Multistage Batch Plants with Sequence Dependent Changeovers

This paper presents two new multiple-time grid, continuous-time mixed integer linear program (MILP) models for the short-term scheduling of multistage, multiproduct plants featuring equipment units with sequence dependent changeovers. Their main difference results from the explicit consideration of changeover tasks as model variables rather than implicitly through model constraints. The former ...

متن کامل

A New Continuous-Time Formulation for the Scheduling of Single Stage Batch Plants with Sequence Dependent Changeovers

This paper presents a new multiple-time grid, continuous-time mixed integer linear program (MILP) model for the short-term scheduling of single stage, multiproduct plants featuring equipment units with sequence dependent changeovers. It considers combined processing and changeover tasks as opposed to handling them separately and is very versatile in terms of type of objective function that can ...

متن کامل

Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...

متن کامل

An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time

This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: AIChE Journal

سال: 2011

ISSN: 0001-1541

DOI: 10.1002/aic.12261