Government choice between contract termination and contract expiration in re-municipalization: a case of historical recurrence?

نویسندگان

چکیده

Since the early 2000s, terms ‘re-municipalization’ and ‘reverse privatization’ entered lexicon as several examples emerged of governments taking ownership assets services that had previously been privatized or outsourced. Various methods are used to implement re-municipalization decisions differences observed across countries sectors. The approaches most frequently adopted through contract termination expiration. We utilize a wide database re-municipalizations worldwide analyse factors influence governments’ choice between these two approaches. results from our multivariate analysis find pattern historical recurrence in characteristics current process. Points for practitioners Most wait contracts expire but number terminations is sizeable. Re-municipalization larger cities, network sectors (particularly water) implemented by municipal have positive association with termination. energy utilities conducted French legal origin positively associated Patterns contemporary closely resemble those witnessed ‘Progressive Era’.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Contract Structure, Risk Sharing, and Investment Choice

Few micro…nance-funded businesses grow beyond subsistence entrepreneurship. This paper considers one possible explanation: that the structure of existing micro…nance contracts may discourage risky but high-expected return investments. To explore this possibility, I develop a theory that uni…es models of investment choice, informal insurance, and formal …nancial contracts. I then test the predic...

متن کامل

Call Center Outsourcing Contract Analysis and Choice

This paper considers a call center outsourcing contract analysis and choice problem, faced by a contractor and a service provider. The service provider receives an uncertain call volume over multiple-periods, and is considering outsourcing all or part of these calls to a contractor. Each call brings in a fixed revenue to the service provider. Answering calls requires having service capacity, th...

متن کامل

Call Center Outsourcing Contract Design and Choice

This paper considers a call center outsourcing contract design and choice problem, faced by an outsourcing vendor and a service provider. The service provider receives an uncertain call volume over multiple-periods, and is considering outsourcing all or part of these calls to an outsourcing vendor. Each call brings in a fixed revenue to the service provider. Answering calls requires having serv...

متن کامل

Evaluation of Construction Contract Termination as a Control Technique

Early termination (or cancellation) in construction is generally regarded as an unpleasant and costly last-resort control technique in the contractual relationship between the owner and the contractor, when their differences cannot be reconciled otherwise. Normally, construction contracts contain clauses that empower the owner to terminate if the contractor materially breaches the contract (i.e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Review of Administrative Sciences

سال: 2021

ISSN: ['1461-7226', '0020-8523']

DOI: https://doi.org/10.1177/00208523211002608