Global optimization of open pit mining complexes with uncertainty

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Uncertainty-based Transition from Open Pit to Underground Mining

There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

Mathematical Optimization Models and Methods for Open-Pit Mining

Amankwah, H. (2011). Mathematical Optimization Models and Methods for Open-Pit Mining. Doctoral dissertation. ISBN 978-91-7393-073-4. ISSN 0345-7524. Open-pit mining is an operation in which blocks from the ground are dug to extract the ore contained in them, and in this process a deeper and deeper pit is formed until the mining operation ends. Mining is often a highly complex industrial operat...

متن کامل

Open pit limit optimization using dijkstra’s algorithm

In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...

متن کامل

robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

open-pit production scheduling (opps) problem focuses on determining a block sequencing and scheduling to maximize net present value (npv) of the venture under constraints. the scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. in order to deal with the opps uncertainties, various approaches can be recommended. robust opti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Soft Computing

سال: 2016

ISSN: 1568-4946

DOI: 10.1016/j.asoc.2015.11.038