Geotechnical profiling of a surface mine waste dump using 2D Wenner–Schlumberger configuration

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Chapter 11: Mine Waste Dump

The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining operation. In this process a dump is formed by casting the waste material and dumping it in nearby area. The dump so formed is known as mine waste dump. Waste dump may be classified as internal and external dump. External dump is created outside the pit where...

متن کامل

Geotechnical Properties of Mine Fill

Mine fill is the material placed underground to fill the voids created by mining excavations. It provides overall large scale ground stabilization while allowing localized pillar recovery. In addition to providing a working floor or back, mine fill has the potential to reduce subsidence and minimize dilution. Mine fill is essential to cut and fill, benching and sublevel stoping mining methods. ...

متن کامل

3D Surface Configuration Modulated 2D Symmetry Detection

We investigated whether three-dimensional (3D) information in a scene can affect symmetry detection. The stimuli were random dot patterns with 15% dot density. We measured the coherence threshold, or the proportion of dots that were the mirror reflection of the other dots in the other half of the image about a central vertical axis, at 75% accuracy with a 2AFC paradigm under various 3D configur...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

Remote Sensing Detection for Subsidence-resulted Water Body and Solid-waste Dump in Coal Mine: Yanzhou Being a Case

Taking LandSat TM/ETM+ images as information source, this paper used the Normalized Difference Water Index (NDWI) to extract mining subsidence-resulted surface water body information in Yanzhou coal mining area. It was found that the extracted water body information would be mixed with solid-waste dumps. Taking DN 40 in band 5 as threshold value, the water bodies and solid-waste dumps were iden...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Open Geosciences

سال: 2021

ISSN: 2391-5447

DOI: 10.1515/geo-2020-0234