Genetic Programming with Delayed Routing for Multiobjective Dynamic Flexible Job Shop Scheduling

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multiobjective Artificial Immune Algorithm for Flexible Job Shop Scheduling Problem

Flexible Job shop scheduling is very important in production management and combinatorial optimization. It is NP-hard problem and consists of two sub-problems: sequencing and assignment. Multiobjective Flexible Job-Shop Scheduling Problems (MFJSSP) is formulated as three-objective problem which minimizes completion time (makespan), critical machine workload and total work load of all machines. ...

متن کامل

Dynamic Job Shop Scheduling Under Uncertainty Using Genetic Programming

Job shop scheduling(JSS) is a hard problem with most of the research focused on scenarios with the assumption that the shop parameters such as processing times, due dates are constant. But in the real world uncertainty in such parameters is a major issue. In this work, we investigate a genetic programming based hyper-heuristic approach to evolving dispatching rules suitable for dynamic job shop...

متن کامل

Flexible Job Shop Scheduling Using a Multiobjective Memetic Algorithm

This paper addresses the flexible job shop scheduling problem with minimization of the makespan, maximum machine workload, and total machine workload as the objectives. A multiobjective memetic algorithm is proposed. It belongs to the integrated approach, which deals with the routing and sequencing sub-problems together. Dominance-based and aggregation-based fitness assignment methods are used ...

متن کامل

A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems

Flexible job shop scheduling problem (fJSP) is an extension of the classical job shop scheduling problem, which provides a closer approximation to real scheduling problems. This paper addresses the fJSP problem with three objectives: min makespan, min maximal machine workload and min total workload. We develop a new genetic algorithm hybridized with an innovative local search procedure (bottlen...

متن کامل

A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling

Flexible job-shop scheduling problem (FJSP) is an NP-hard puzzle which inherits the job-shop scheduling problem (JSP) characteristics. This paper presents a bee evolutionary guiding nondominated sorting genetic algorithm II (BEG-NSGA-II) for multiobjective FJSP (MO-FJSP) with the objectives to minimize the maximal completion time, the workload of the most loaded machine, and the total workload ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Evolutionary Computation

سال: 2021

ISSN: 1063-6560,1530-9304

DOI: 10.1162/evco_a_00273