Generating Labour Cost Budget for a Construction-Oriented Fabrication Facility: Simulation-based Resource Scheduling Approach

نویسندگان

چکیده

A novel labour-hour budgeting methodology is proposed by integrating productivity concepts in project scheduling and to enhance the accuracy of labour cost for planning labour-intensive projects. The applies discrete event simulation approach represent crew formation, resource utilization flowing between consecutive activities, which allows quantitatively characterizing impact semi-productive time on as a time-dependent variable. Simulation-based assessment variations sizes allocations conducive reducing thus enhancing performance whole project. then applied real-world case study steel girder fabrication projects construction highway bridges. Not limited resources construction-oriented facility, research contributions are also significant other settings where shared utilized among different activities.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simplification Methods for Accelerating Simulation-Based Real-Time Scheduling in a Semiconductor Wafer Fabrication Facility

This paper presents a real-time scheduling methodology in a semiconductor wafer fab that produces multiple product types with different due dates. In the suggested real-time scheduling method, lot scheduling rules and batch scheduling rules are selected from sets of candidate rules based on information obtained from discrete event simulation. Since a rule combination that gives the best perform...

متن کامل

Ergonomics and simulation-based approach in improving facility layout

The use of the simulation-based technique in facility layout has been a choice in the industry due to its convenience and efficient generation of results. Nevertheless, the solutions generated are not capable of addressing delays due to worker’s health and safety which significantly impact overall operational efficiency. It is, therefore, critical to incorporate ergonomics in facility design. I...

متن کامل

Classroom-Oriented Higher Education System or Workshop-Oriented Higher Education System (Based on Cost & Economic Approach)

The most important goal of each society, is to reach economic development. As the goal and agent of development, man has got an important responsibility, which responsibility is realized by way of education, specially higher education, because the universities are the main factors for progress, production of knowledge and education of specialized human forces and they play a significant role in...

متن کامل

Agent-based approach for cooperative scheduling

This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...

متن کامل

Negotiation Protocol Based on Budget Approach for Adaptive Manufacturing Scheduling

The research proposed concerns the development of a multi-agent scheduling approach able to support manufacturing systems in different dynamic conditions. The negotiation protocol defined budget approach is based on a financial asset that each part obtains when it is released into the manufacturing system for processing. The part spends the budget to perform the manufacturing operations by the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Canadian Journal of Civil Engineering

سال: 2021

ISSN: ['1208-6029', '0315-1468']

DOI: https://doi.org/10.1139/cjce-2020-0429