General multi-product, multi-pollutant market pollution permit model: a variational inequality approach

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Three-Echelon Multi-Objective Multi-Period Multi-Product Supply Chain Network Design Problem: A Goal Programming Approach

In this paper, a multi-objective multi-period multi-product supply chain network design problem is introduced. This problem is modeled using a multi-objective mixed integer mathematical programming. The objectives are maximizing the total profit of logistics, maximizing service level, and minimizing inconsistency of operations. Several sets of constraints are considered to handle the real situa...

متن کامل

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem

Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...

متن کامل

Market Power in Pollution Permit Markets*

As with other commodity markets, markets for trading pollution permits have not been immune to market power concerns. In this paper, I survey the existing literature on market power in permit trading but also contribute with some new results and ideas. I start the survey with Hahn’s (1984) dominant-firm (static) model that I then extend to the case in which there are two or more strategic firms...

متن کامل

On Pollution Permit Banking and Market Power

We consider a pollution permits market in which there are a large polluting firm plays and a fringe of competitive firms. To smooth compliance towards the longrun emissions goal, firms are initially allocated a stock (i.e., bank) of permits to be gradually consumed. We first show how the large firm can credibly manipulate the spot market in subgame-perfect equilibrium. Motivated by features obs...

متن کامل

A new multi-mode and multi-product hub covering problem‎: ‎A priority M/M/c queue ‎approach

One main group of a transportation network is a discrete hub covering problem that seeks to minimize the total transportation cost. This paper presents a multi-product and multi-mode hub covering model, in which the transportation time depends on travelling mode between each pair of hubs. Indeed, the nature of products is considered different and hub capacity constraint is also applied. Due to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energy Economics

سال: 1997

ISSN: 0140-9883

DOI: 10.1016/s0140-9883(96)01007-9