Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Yard crane scheduling in port container terminals using genetic algorithm

Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...

متن کامل

Quay crane scheduling with non-interference constraints in port container terminals

The quay crane scheduling problem studied in this paper is to determine a handling sequence of holds for quay cranes assigned to a container vessel considering interference between quay cranes. This paper provides a mixed integer programming model for the considered quay crane scheduling problem that is NP-complete in nature. A genetic algorithm is proposed to obtain near optimal solutions. Com...

متن کامل

An Approximation Algorithm for Quay Crane Scheduling with Non- interference Constraints in Port Container Terminals

Nowadays competition between port container terminals, especially between geographically close ones, is rapidly increasing. How to improve the competitiveness of port container terminals is, therefore, an immediate challenge, with which port operators are confronted. In terms of port competitiveness, the makespan of a container vessel, which is the latest completion time among all handling task...

متن کامل

Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode

Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal...

متن کامل

yard crane scheduling in port container terminals using genetic algorithm

yard crane is an important resource in container terminals. efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. this paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is nphard in nature. in other words, one of the most important constraints in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Computational Intelligence Systems

سال: 2013

ISSN: 1875-6891,1875-6883

DOI: 10.1080/18756891.2013.768444