GA Based Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Uniform Parallel Machines

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

GA Based Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Uniform Parallel Machines

This paper considers the single machine scheduling problem with uniform parallel machines in which the objective is to minimize the makespan. Four different GA based heuristics are designed by taking different combinations of crossover methods, viz. single point crossover method and two point crossover method, and job allocation methods while generating initial population, viz. equal number of ...

متن کامل

Efficient Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Unrelated Parallel Machines

This paper discusses an efficient heuristic to minimize the makespan of scheduling n independent jobs on m unrelated parallel machines. The problem of scheduling the jobs on the unrelated parallel machines is combinatorial in nature. Hence, the heuristic approach is inevitable for quicker solution. In this paper, a simple and efficient heuristic is designed to minimize the makespan of schedulin...

متن کامل

Simulated Annealing Algorithm to Minimize Makespan in Single Machine Scheduling Problem with Uniform Parallel Machines

This paper presents a simulated annealing algorithm to minimize makespan of single machine scheduling problem with uniform parallel machines. The single machine scheduling problem with uniform parallel machines consists of n jobs, each with single operation, which are to be scheduled on m parallel machines with different speeds. Since, this scheduling problem is a combinatorial problem; usage o...

متن کامل

A heuristic to minimize makespan of cell scheduling problem

Scheduling problem in a cellular manufacturing environment is treated as group scheduling problem, which assumes that all parts in a part family are processed in the same cell and no inter-cellular transfer is needed. In a typical CMS environment, however, there could be some exceptional parts, which need to visit machines in the other cells. This fact limits the applicability of group scheduli...

متن کامل

Single-machine scheduling with periodic maintenance to minimize makespan

We consider a single-machine scheduling problem with periodic maintenance activities. Although the scheduling problem with maintenance has attracted researchers’ attention, most of past studies considered only one maintenance period. In this research several maintenance periods are considered where each maintenance activity is scheduled after a periodic time interval. The objective is to find a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Intelligent Information Management

سال: 2011

ISSN: 2160-5912,2160-5920

DOI: 10.4236/iim.2011.35025