Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...

متن کامل

Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence

This paper discusses a two-stage assembly-type flowshop scheduling problem with batching considerations subject to a fixed job sequence. The two-stage assembly flowshop consists of m stage-1 parallel dedicated machines and a stage-2 assembly machine which processes the jobs in batches. Four regular performance metrics, namely, the total completion time, maximum lateness, total tardiness, and nu...

متن کامل

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...

متن کامل

Bi-criteria Three Stage Fuzzy Flowshop Scheduling with Transportation Time and Job Block Criteria

Scheduling is an enduring process where the existence of real time information frequently forces the review and modification of pre-established schedules. The real world is complex and complexity generally arises from uncertainty. From this prospective the concept of fuzziness is introduced in the field of scheduling. The present paper pertains to a bi-criterion in n-jobs, three machines fl...

متن کامل

Scheduling Batch Processing Machines in Complex Job Shops

This paper considers a complex job shop problem with reentrant flow and batch processing machines. A modified shifting bottleneck heuristic (MSB) is considered for generating machine schedules to minimize the total weighted tardiness. We observe that the MSB could produce infeasible schedules where cyclic schedules are found. A cycle elimination procedure is proposed to remove the possibility o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Approximate Reasoning

سال: 2009

ISSN: 0888-613X

DOI: 10.1016/j.ijar.2007.08.013