Fuzzy Material Requirements Planning
نویسندگان
چکیده
منابع مشابه
Net Change Material Requirements Planning
Defined and evaluated are concepts and characteristics of net change, a method that facilitates replanning and provides timely response to chunge in a transaction-oriented system. (MRP) entail an inherent massive data-handling task. Consequently , batch-oriented MRP systems tend to be untimely in their response to change since replanning can be done only periodically at best, probably once a we...
متن کاملThe early road to material requirements planning
Material requirements planning (MRP) systems became a prominent approach to managing the flow of raw material and components on the factory floor in the late 20th century. Its adoption was not an over night phenomenon, but was a slow progression over many decades. This article chronicles many developments and events during the formative years of MRP, highlighting changes in computer technology ...
متن کاملFocusing material requirements planning (MRP) towards performance
This paper looks at the successes and disappointments of MRP. It studies numerous articles to determine what the key shortcomings of MRP are. Next, it investigates if these failures are correctable, and what the consequences of not correcting these de®ciencies means. This article considers alternatives that have been discussed in the current literature. Last of all this article discusses whethe...
متن کاملMaterial Requirement Planning under Fuzzy Lead Times
This paper proposes a fuzzy multi-objective integer linear programming approach to model a material requirement planning (MRP) problem with fuzzy lead times. We incorporate to the crisp MRP model the possibility of occurrence of each one of the possible lead times. Then, an objective function that maximizes the possibility of occurrence of the lead times is considered. By combining this objecti...
متن کاملMaterial Requirement Planning with fuzzy constraints and fuzzy coefficients
Wepropose a new fuzzymathematical programmingmodel for production planning under uncertainty in an industrial environment. This model considers fuzzy constraints related to the total costs, the market demand and the available capacity of the productive resources and fuzzy coefficients for the costs due to the backlog of demand and for the required capacity. The main goal is to determine the mas...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Mathematics and Computer Science
سال: 2010
ISSN: 2008-949X
DOI: 10.22436/jmcs.001.04.10