Fuzzy-Logic Controlled Genetic Algorithm for the Rail-Freight Crew-Scheduling Problem
نویسندگان
چکیده
منابع مشابه
Rail-Freight Crew Scheduling with a Genetic Algorithm
This article presents a novel genetic algorithm designed for the solution of the Crew Scheduling Problem (CSP) in the rail-freight industry. CSP is the task of assigning drivers to a sequence of train trips while ensuring that no driver’s schedule exceeds the permitted working hours, that each driver starts and finishes their day’s work at the same location, and that no train routes are left wi...
متن کاملthe algorithm for solving the inverse numerical range problem
برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.
15 صفحه اولMultiobjective Genetic Algorithm to Solve the Train Crew Scheduling Problem
-This paper presents a multiobjective genetic algorithm (MOGA)to solve the train crew pairing problem in railway companies. The proposed MOGA has several features, such as 1) A permutation-based model is proposed rather than the 0-1 set partition model. 2) Instead of pre-assigning a fixed group number of crewmembers, the proposed method can determine it by performing the evolutionary process. 3...
متن کاملUnit Commitment Problem Using Fuzzy Logic Controlled Genetic Algorithm
The fuzzy logic has been applied in combination with Genetic Algorithm (GA) to solve the unit commitment problem (UCP). For smooth and better convergence in GA, the crossover probability and mutation rate are adjusted by fuzzy logic strategy leading to an improved GA technique termed as Fuzzy Logic Controlled Genetic Algorithm (FLCGA). An FLCGA for determining the solution for this UCP has been...
متن کاملA Genetic Algorithm Developed for a Supply Chain Scheduling Problem
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: KI - Künstliche Intelligenz
سال: 2017
ISSN: 0933-1875,1610-1987
DOI: 10.1007/s13218-017-0516-6