FUZZY CLUSTERING CHAOTIC-BASED DIFFERENTIAL EVOLUTION FOR RESOURCE LEVELING IN CONSTRUCTION PROJECTS
نویسندگان
چکیده
منابع مشابه
Resource Leveling in Fuzzy Project Scheduling
In this paper a new method based on fuzzy theory is developed to solve the Project Resource Leveling Problem in fuzzy environment. Resource Leveling Problem attempts to minimize the resource usage fluctuations in project plan. Assuming that the duration of activities and resource requirements are fuzzy, in this method we compute several project characteristics such as earliest times, latest tim...
متن کاملModel-based dynamic resource management for construction projects
Excess resource idling can result in cost overruns, while low resource coverage or long lead-time in resource acquisition can delay the project schedule. Therefore, systematically managing this tradeoff is critical to ensure project delivery in time and within budget. In addition, to provide practically useful guidelines and tools, the dynamic construction process needs to be realistically repr...
متن کاملA Differential Evolution and Spatial Distribution based Local Search for Training Fuzzy Wavelet Neural Network
Abstract Many parameter-tuning algorithms have been proposed for training Fuzzy Wavelet Neural Networks (FWNNs). Absence of appropriate structure, convergence to local optima and low speed in learning algorithms are deficiencies of FWNNs in previous studies. In this paper, a Memetic Algorithm (MA) is introduced to train FWNN for addressing aforementioned learning lacks. Differential Evolution...
متن کاملEquitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach
An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...
متن کاملTime Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry
This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
سال: 2016
ISSN: 1392-3730,1822-3605
DOI: 10.3846/13923730.2014.982699