Full scale test of ZXCY-Series linear motor pumping units
نویسندگان
چکیده
منابع مشابه
planning and manufacturing of linear induction motor for pumping of chemical liquids
in this research using the theory of induction motor (um), a um with liquid as secondary part is planned and manufactured. the main objective for planning of this motor is to investigate the possibility of chemical liquids pumping such as liquid poison and acids. results of many laboratory tests are shown to conclude that pumping force in the manufactured pump is dependent on many factors su...
متن کاملLessons from a Full Scale Fire Test
This paper draws together some important lessons from a compartment fire test conducted by BRE in the full-scale eight storey steel building at Cardington. The experiment is briefly described, and the main structural observations are highlighted. A numerical structural model of the fire compartment, using the nonlinear analysis program ADAPTIC, is then discussed. The numerical analysis employs ...
متن کاملconstruction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers
the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...
Integration Test of Iter Full-scale Vacuum Vessel Sector
The full-scale Sector Model Project, which was initiated in 1995 as one of the Large Seven ITER R&D Projects, completed all R&D activities planned in the ITER-EDA period with the joint effort of the ITER Joint Central Team (JCT), the Japanese, the Russian Federation (RF) and the United States (US) Home Teams. The fabrication of a full-scale 18 toroidal sector, which is composed of two 9 sectors...
متن کاملMotor development evaluated by Test of Infant Motor Performance: comparison between preterm and full-term infants.
OBJECTIVES To compare the motor development of preterm infants whose gestational age had been corrected to 38-40 weeks with full term newborns using the Test of Infant Motor Performance (TIMP). METHODS The cross-sectional study compared preterm infants (PT group), with a gestational age at birth of 28-33 weeks, at an equivalent age to full term newborns (FT group), who were assessed up to 48 ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Petroleum Exploration and Development
سال: 2008
ISSN: 1876-3804
DOI: 10.1016/s1876-3804(08)60085-3