FRESH AND SALTWATER MOVEMENT AFTER INSTALLATION OF CUT-OFF WALL IN CONFINED AQUIFER
نویسندگان
چکیده
منابع مشابه
Laboratory study of the simultaneous effect of discharge well and cut of wall on reducing saltwater intrusion in coastal aquifers
These days, the sea level rising and excessive harvesting of coastal aquifers has caused the intrusion of saltwater into underground water sources. In this study, the performance of the use of cut of wall, discharge well, and their simultaneous use in preventing saltwater intrusion has been evaluated in a laboratory model and under different scenarios. The results show that the appropriate use ...
متن کاملThe effects of cut-off walls on repulsing saltwater based on modeling of density-driven groundwater flow and salt transport
Abstract: A two-dimensional fully implicit finite difference model, which can be easily extended to three dimensions, is developed to study the effect of cut-off walls on saltwater intrusion into the aquifers. This model consists of a coupled system of two nonlinear partial differential equations which describe unsteady density-driven groundwater flow and solute transport. The numerica...
متن کاملThe Effect of Cut-off Wall on Seepage and Uplift Pressure under Earth Dam (Case Study: Shamil Dam in Iran)
Design of earth dams and their problems are important during construction and after it,because of their potential hazards and failure for downstream population. The dam foundation seepage control the the importance from the perspective of a major engineering project and explain the economic performance of each project is allocated. among activities that can be used to prevent piping phenomena a...
متن کاملCompare the geo-electric and geo-electromagnetic methods in determining saltwater and fresh water interference in the aquifer West and East Babolsar
Groundwater is of the most reliable sources of water for agriculture and drinking. In coastal areas due to saltwater intrusion, determine the interface between fresh and salt water for residents of these areas is very important. In this study, the characteristics of coastal aquifers West and East Babolsar, using geoelectrical studies and geo-electromagnetic studied that these methods are of the...
متن کاملThe Investigation of Effective Factors in the Removal of Bentonite Jelly from the Joints of Cut-off Wall Panels
In the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. In this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. The concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Japan Society of Civil Engineers, Ser. B1 (Hydraulic Engineering)
سال: 2011
ISSN: 2185-467X
DOI: 10.2208/jscejhe.67.i_601