Frequency Reserve Within Unit Commitment Considering Spinning Reserve Uncertainty

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Lagrangian Relaxation-Based Unit Commitment Considering Fast Response Reserve Constraints

Unit commitment (UC) is to determine the optimal unit status and generation level during each time interval of the scheduled period. The purpose of UC is to minimize the total generation cost while satisfying system demand, reserve requirements, and unit constraints. Among the UC constraints, an adequate provision of reserve is important to ensure the security of power system and the fast-respo...

متن کامل

Unit Commitment With Probabilistic Reserve

This paper demonstrates how a probabilistic criterion based on the full capacity outage probability distribution (e.g., LOLP) could be integrated into the unit commitment (UC) optimization using simple statistical approximation. While this provides a direct and computationally cheaper means as compared to a recently published approach to locating the globally optimal SR allocation (and associat...

متن کامل

Solution to Unit Commitment Problem with Spinning Reserve and Ramp Rate Constraints Using Ant Colony System

In this paper unit commitment problem (UCP) with spinning reserve and ramp rate constraint has been solved using Ant Colony System (ACS). In this model, foraging behavior of the real ants for finding its food from its start (nest) to its destination (food) is simulated to obtain the optimum solution. A search strategy has been adopted which involves the artificial ants to obtain the minimum cos...

متن کامل

What is spinning reserve?

This document proposes a definition of spinning reserve. It also compares the amount asked by TSOs in several systems according to this definition. What is spinning reserve?

متن کامل

Unit Commitment Considering Position of Interruptible Load in Energy and Reserve Simultaneous Market

In this paper security constrained unit commitment (SCUC) is employed for simultaneous clearing of energy and reserve markets. Spinning reserve of production units and interruptible loads (IL) are used as system operation reserve. Some restrictions on the use of interruptible loads, such as maximum load curtailed, maximum curtailment hour in a day, maximum length of each curtailment are also co...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Energy Engineering

سال: 2012

ISSN: 2163-1891

DOI: 10.5923/j.ijee.20120204.10