Four-Dimensional Visualization of Construction Scheduling and Site Utilization

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Four-dimensional visualization of rising microbubbles

Four-dimensional imaging, which indicates imaging in three spatial dimensions as a function of time, provides useful evidence to investigate the interactions of rising bubbles. However, this has been largely unexplored for microbubbles, mostly due to problems associated with strong light scattering and shallow depth of field in optical imaging. Here, tracking x-ray microtomography is used to vi...

متن کامل

Visualization of Surfaces in Four-Dimensional Space

We discuss some issues of displaying ~wo-dimensional surfaces in four-dimensional (4D) space, including the behavior of surface normals under projedion, the silhouette points due to the projection, and methods Cor object orientation and projection center specification. We have implemented an interactive 4D display system on z-butrer based graphics workstations. Preliminary experiments show that...

متن کامل

construction and validation of translation metacognitive strategy questionnaire and its application to translation quality

like any other learning activity, translation is a problem solving activity which involves executing parallel cognitive processes. the ability to think about these higher processes, plan, organize, monitor and evaluate the most influential executive cognitive processes is what flavell (1975) called “metacognition” which encompasses raising awareness of mental processes as well as using effectiv...

Mixed Reality for Mobile Construction Site Visualization and Communication

ABSTRACT: This article gives an presentation of the AR4BC (Augmented Reality for Building and Construction) software system, consisting of the following modules. The 4DStudio module is used to read in BIMs and link them to a project time table. It is also used to view photos and other information attached to the model from mobile devices. The MapStudio module is used to position the building mo...

متن کامل

construction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers

the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Construction Engineering and Management

سال: 2004

ISSN: 0733-9364,1943-7862

DOI: 10.1061/(asce)0733-9364(2004)130:4(598)