Forecasting construction time for road projects and infrastructure using the fuzzy PERT method
نویسندگان
چکیده
منابع مشابه
Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry
This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...
متن کاملtime prediction using a neuro-fuzzy model for projects in the construction industry
this paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. the output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (llnf) model, is useful for assessing a project status at different time horizons. being trained by a locally linear model tree (lolimot) learning algorithm, the model is int...
متن کاملCost Performance Estimation in Construction Projects Using Fuzzy Time Series
In this paper, the authors develop a model to estimate future performance of construction projects. For the purpose of estimation, fuzzy times series models are used as an effective approach in estimation process. Furthermore, linguistic terms are applied to interpret the fuzzy-based results. The proposed model can assists project managers to develop their knowledge concerning the future aspect...
متن کاملthe use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach
abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...
15 صفحه اولA Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal
This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IOP Conference Series: Materials Science and Engineering
سال: 2021
ISSN: 1757-8981,1757-899X
DOI: 10.1088/1757-899x/1076/1/012123