Forecasting Completed Cost of Highway Construction Projects Using LASSO Regularized Regression
نویسندگان
چکیده
منابع مشابه
Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks
Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...
متن کاملSchedule Multiple Highway Construction Projects
The scheduling of numerous construction projects considering several factors is an important challenge faced by construction companies, particularly road builders. Road builders need to make decision to identify the best possible schedule to complete multiple constructions while considering multiple factor such as maximizing profit, reducing risk, and resource constraints among many other factors.
متن کاملStock Market Forecasting Using LASSO Linear Regression Model
Predicting stock exchange rates is receiving increasing attention and is a vital financial problem as it contributes to the development of effective strategies for stock exchange transactions. The forecasting of stock price movement in general is considered to be a thought-provoking and essential task for financial time series' exploration. In this paper, a Least Absolute Shrinkage and Selectio...
متن کاملGenomic selection using regularized linear regression models: ridge regression, lasso, elastic net and their extensions
BACKGROUND Genomic selection (GS) is emerging as an efficient and cost-effective method for estimating breeding values using molecular markers distributed over the entire genome. In essence, it involves estimating the simultaneous effects of all genes or chromosomal segments and combining the estimates to predict the total genomic breeding value (GEBV). Accurate prediction of GEBVs is a central...
متن کاملForecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method
Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Construction Engineering and Management
سال: 2017
ISSN: 0733-9364,1943-7862
DOI: 10.1061/(asce)co.1943-7862.0001378