FMEA and Alternatives v/s Enhanced Risk Assessment Mechanism
This paper starts with description of the widely used risk assessment tool Failure Modes & Effects Analysis. The paper then later examines some of the alternative methods for risk assessment and their advantages. In this work, we also point out the advantages of using Six Sigma in Risk Assessment and propose a novel technique which would overcome the restrictions of existing Risk Management tools.
متن کاملRisk Assessment and Alternatives Assessment: Comparing Two Methodologies
The selection and use of chemicals and materials with less hazardous profiles reflects a paradigm shift from reliance on risk minimization through exposure controls to hazard avoidance. This article introduces risk assessment and alternatives assessment frameworks in order to clarify a misconception that alternatives assessment is a less effective tool to guide decision making, discusses factor...
متن کاملlpg storage spheres risk assessment with fmea and etba methods
introduction: everyone who wants to analyze the safety needs to choose one method among all available ways. this study was carried out to identify energies and barriers in lpg storage spheres in a petrochemical complex using etba method. it also examines the quantitative evaluation of failure modes and their effects as well as evaluation of effect of fmea and comparing the results plus the iden...
متن کاملSu - 30 vs RAAF ALTERNATIVES
Many readers will be asking the obvious question of how the Sukhois stack up against the F/A-18A HUG, the F-35 JSF and possible interim fighters such as the F/A-18E/F. Against all three types the Su-30 derivatives, especially with later engine subtypes, will always have a significant kinematic advantage – there is no substitute for thrust in the kinematic performance game. There is another fact...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Computer Applications
سال: 2014
ISSN: 0975-8887
DOI: 10.5120/16284-6047