Flexible Flowshop with Limited Intermediate Storage
In this project, we first planned to model a manufacturing system using a partial differential equation (PDE), since in the theory of traffic simulation and control, PDEs are used successfully for modeling the dynamic behavior of highway traffic. Because these traffic models show good correspondence with manufacturing systems (vehicles = products, highway = manufacturing system), PDEs can also ...
متن کاملFlexible flowshop scheduling with equal number of unrelated parallel machines
This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...
متن کاملA Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...
متن کاملScheduling Two-machine Flowshop with Limited Waiting Times to Minimize Makespan
There are numerous instances of flowshop in the production process of process industry. When such characteristics as continuous production resulted from high-temperature environment or deteriorate intermediate products are took into consideration, it should be ensured that the waiting time of any job between two consecutive machines is not greater than a given value, which results in the flowsh...
متن کاملTwo-Machine Flowshop Scheduling with Conditional
This paper considers a flowshop scheduling problem with a waiting time constraint imposed to restrict the processing of the two operations of each job. If the second operation of a job cannot start within a specified waiting time after the completion of its first operation, then an extra processing time will be incurred for its second operation as a penalty. We first show that is even a greatly...
متن کاملذخیره در منابع من