Flowshop Scheduling by Genetic Algorithm and Its Application to Multi-Objective Problems

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

متن کامل

َa multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

this paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. this paper presen...

متن کامل

Restarted Iterated Pareto Greedy algorithm for multi-objective flowshop scheduling problems

Multi-objective optimisation problems have seen a large impulse in the last decades. Many new techniques for solving distinct variants of multi-objective problems have been proposed. Production scheduling, as with other operations management elds, is no di erent. The owshop problem is among the most widely studied scheduling settings. Recently, the Iterated Greedy methodology for solving the si...

متن کامل

Using Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insurance

Efficient and on-time maintenance plays a crucial role inreducing cost and increasing the market share of an industrial unit. Preventivemaintenance is a broad term that encompasses a set of activitiesaimed at improving the overall reliability and availability of a systembefore machinery breakdown. The previous studies have addressed thescheduling of preventive maintenance. These studies have co...

متن کامل

A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines

In this paper we propose a two-stage Multi-Population Genetic Algorithm (MPGA) to solve parallel machine scheduling problems with multiple objectives. In the first stage, multiple objectives are combined via the multiplication of the relative measure of each objective. Solutions of the first stage are arranged into several sub-populations, which become the initial populations of the second stag...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transactions of the Society of Instrument and Control Engineers

سال: 1995

ISSN: 0453-4654

DOI: 10.9746/sicetr1965.31.583