Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flow Shop Scheduling with Earliness, Tardiness and Intermediate Inventory Holding Costs

We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding) and intermediate (work-in-process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two different, but closely related, Dantzig-Wolfe reformulations, we develop heur...

متن کامل

A Hybrid Approach to Scheduling with Earliness and Tardiness Costs

A hybrid technique using constraint programming and linear programming is applied to the problem of scheduling with earliness and tardiness costs. The linear model maintains a set of relaxed optimal start times which are used to guide the constraint programming search heuristic. In addition, the constraint programming problem model employs the strong constraint propagation techniques responsibl...

متن کامل

Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs

W e consider multimachine scheduling problems with earliness and tardiness costs. We first analyze problems in which the cost of a job is given by a general nondecreasing, convex function F of the absolute deviation of its completion time from a (common) unrestrictive duedate, and the objective is to minimize the sum of the costs incurred for all N jobs. (A special case to which considerable at...

متن کامل

Minimizing earliness and tardiness costs in stochastic scheduling

We address the single-machine stochastic scheduling problem with an objective of minimizing total expected earliness and tardiness costs, assuming that processing times follow normal distributions and due dates are decisions. We develop a branch and bound algorithm to find optimal solutions to this problem and report the results of computational experiments. We also test some heuristic procedur...

متن کامل

Dynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness

This paper aims to develop a multi-objective model for scheduling cargo trains faced by the costs of tardiness and earliness, time limitations, queue priority and limited station lines. Based upon the Islamic Republic of Iran Railway Corporation (IRIRC) regulations, passenger trains enjoy priority over other trains for departure. Therefore, the timetable of cargo trains must be determined based...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Naval Research Logistics (NRL)

سال: 2004

ISSN: 0894-069X

DOI: 10.1002/nav.20000