Flow-Induced Stresses and Displacements in Jointed Concrete Pipes Installed by Pipe Jacking Method
نویسندگان
چکیده
منابع مشابه
Stresses and Displacements in Functionally Graded Materials of Semi-Infinite Extent Induced by Rectangular Loadings
This paper presents the stress and displacement fields in a functionally graded material (FGM) caused by a load. The FGM is a graded material of Si₃N₄-based ceramics and is assumed to be of semi-infinite extent. The load is a distributed loading over a rectangular area that is parallel to the external surface of the FGM and either on its external surface or within its interior space. The point-...
متن کاملA Study of Flow and Mixing in Bubbly Gas-Liquid Pipe Flow Generated by a Grid
The spreading of a tracer in a bubbly two-phase grid-generated turbulent flow system is studied. In this work both particle image velocimetry (PIV) and planer laser-induced <span style="font-size: 10pt...
متن کاملNumerical Analysis Research of Jacking Method with the Rectification on Steel-Concrete Buildings
This paper first analyzes the tilting reasons of a steel-concrete building in Zhangjiakou city in China. Then, a jacking rectification method which combines the pie-cutting method and the excavation of stress release trench was put forward. This analysis method uses the three-dimensional numerical simulation for soil settlement and vertical displacement and internal force of upper structure in ...
متن کاملTorsional displacements and stresses in non-homogeneous soil
A study is presented of the axially symmetric deformation of a non-homogeneous elastic halfspace subjected to torsional shear tractions that are linearly distributed over a circular portion of the otherwise free surface. The problem is formulated in terms of Hankel integral transforms and an inverse procedure is implemented in which the determination of the type of non-homogeneity constitutes p...
متن کاملSmoothness variations in early-age jointed plain concrete pavements
This paper discusses the variations in the early-age pavement smoothness at different measurement times and locations in three jointed plain concrete pavements ( JPCPs) representing different ranges of construction times. Surface profile measurements were made during the early morning and late afternoon hours at different locations of the instrumented JPCPs during the first 7 d after constructi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Fluids
سال: 2019
ISSN: 2311-5521
DOI: 10.3390/fluids4010034