منابع مشابه
Control-Flow Semantics for Assembly-Level Data-Flow Graphs
As part of a larger project, we have built a declarative assembly language that enables us to specify multiple code paths to compute particular quantities, giving the instruction scheduler more flexibility in balancing execution resources for superscalar execution. Since the key design points for this language are to only describe data flow, have built-in facilities for redundancies, and still ...
متن کاملA Two-Level Flow Control Scheme for High Speed Networks
Many new network applications demand interprocess communication (IPC) services with guaranteed bandwidth, delay, and low. Existing transport protocol mechanisms have not been designed with these service objectives. Large bandwidth-delay products of high-speed networks also render the existing flow control mechanism inefficient. This paper presents the design, evaluation, and implementation of a...
متن کاملAutomatic Creation of Simulation Models for Flow Assembly Lines
This paper presents a new software tool for automatic creation of simulation models for flow lines. The tool was developed in a general way. The tool was applied to the production flow line at the rolling stock Company Bombardier Transportation Portugal, SA, in Amadora, in order to develop its simulation model. Information regarding manufacturing philosophies, flow assembly lines, production sc...
متن کاملUsability of cushions designed specifically for car industries’ assembly lines
Background: Ergonomics is a science that provides methods of creating reasonable adaption between occupation and worker by improving usability through consideration of job demands and human ability to satisfy them. A deep understanding of user’s thoughts on and attitudes toward utilizing a tool could improve its design. In the present study, two cushions designed particularly for one of c...
متن کاملEfficient material flow in mixed model assembly lines
In this study, material flow from decentralized supermarkets to stations in mixed model assembly lines using tow (tugger) trains is investigated. Train routing, scheduling, and loading problems are investigated in parallel to minimize the number of trains, variability in loading and in routes lengths, and line-side inventory holding costs. The general framework for solving these problems in par...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Research
سال: 1996
ISSN: 0020-7543,1366-588X
DOI: 10.1080/00207549608905034