Flood control strategy in kali sabi river basin in Tangerang

نویسندگان

چکیده

Tangerang has suffered from severe urban floods frequently. Flood control and management of the areas are needed to attain better social economic rates, including reduce damage assets. This paper discusses some possible strategies flood systems suggests that government should apply in Kali Sabi river basin, City. Deciding water retention as one best ways be applied is begun with study survey on several parameters hydrologic components topography, watershed delineation, rainfall analysis, possibility analysis planning management. The results strategy manage stagnation by constructing a basin. area relatively flat topography slightly high rainfall. However, there also been an improper drainage system. These circumstances resulted having long time ground. Based consideration systems, basin solution. Practically, runoff discharge 158.44 m3/s causing flooding could accommodated construction.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

India: Flood Management - Damodar River Basin

Information is provided about the approach and experience in flood management in the Damodar river basin of India. This is achieved through a scheme for the integrated operation of a number of reservoirs on that river and on its tributaries for the purpose of irrigation, hydropower generation and flood protection. Of particular interest is the recent change in policy towards a multi-disciplinar...

متن کامل

Flood Risk and River Basin Management

The aim of this study is to identify the sources of uncertainty that induce the largest uncertainties in the model outcomes and quantify this uncertainty using expert elicitation. Analysis of expert opinions showed that the Qh-relation and the roughness predictor of the main channel cause the largest uncertainties for design water level computations. For effect studies, the floodplain topograph...

متن کامل

Flood Risk and River Basin Management

Recent scenario studies on water management focus on one or two projection years and the effects on the water system and functions. The future is however more complex and dynamic. Therefore, we analyse transient scenarios in order to evaluate the performance of water management strategies. Current available simulation tools are not suitable for this purpose. Therefore, we have developed and use...

متن کامل

Optimized Flood Control in the Columbia River Basin for a Global Warming Scenario

Anticipated future temperature changes in the mountainous U.S. Pacific Northwest will cause reduced spring snow pack, earlier melt, earlier spring peak flow and lower summer flow in transient rain-snow and snowmelt dominant river basins. In the context of managed flood control, these systematic changes are likely to disrupt the balance between flood control and reservoir refill in existing rese...

متن کامل

development and implementation of an optimized control strategy for induction machine in an electric vehicle

in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP conference series

سال: 2021

ISSN: ['1757-899X', '1757-8981']

DOI: https://doi.org/10.1088/1755-1315/871/1/012043