Float-Based Resource Leveling Optimization of Linear Projects

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimization model for resource assignment problems of linear construction projects

For linear construction projects, it has long been known that resource utilization is i]mportant in improving work efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This study presents a flexible model for resolving linear scheduling problems involving different objectives and resource assignment tasks. The proposed model adopts constraint...

متن کامل

Resource leveling scheduling by an ant colony-based model

In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...

متن کامل

Optimization of Resource Allocation and Leveling Using Genetic Algorithms

Resource allocation and leveling are among the top challenges in project management. Due to the complexity of projects, resource allocation and leveling have been dealt with as two distinct subproblems solved mainly using heuristic procedures that cannot guarantee optimum solutions. In this paper, improvements are proposed to resource allocation and leveling heuristics, and the Genetic Algorith...

متن کامل

A GA-based fuzzy resource leveling optimization for helicopter maintenance activity

Genetic algorithm is one of the main heuristics that have been applied to scheduling problems in the last few decades. This paper presents a generalization of the genetic algorithm for solving project scheduling problem under time uncertainties within resource leveling technique. The generalization consists of handling fuzzy time parameter and fuzzy resource distribution instead of crisp ones. ...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2020

ISSN: 2169-3536

DOI: 10.1109/access.2020.3027058